22 June 2026

Groundwater Bank in Water Stress Areas Project

Environment

CP Axtra has recognized that water consumption in water-stressed areas is vulnerable to water stress and drought which can potentially affect the water pricing structure of the operating areas. The Company has worked diligently with suppliers to monitoring the water pricing structure and identify mitigation plans, if the regulatory changes may arise. With that CP Axtra has adopted a ground water bank within the water stress areas. The water sump with vertical piping that is installed to collect flash rainfall well-treated wastewater and flow to the water reservoir or increase water absorption. The pilot project is in Yasothon and has expanded to another water stress area in Maha Sarakham province. The efforts to monitor water pricing structure as well as the mitigation actions will be implemented to farmers in the nearby community as well.

2025 Performance

  • Over 32 cubic meters returned to nature through groundwater bank pipe
  • Over 155,520 Baht in cost savings per year.
  • 20 farmers and community in water stress are trained